CONSTRUCTION SPECIFICATION FOR TRENCHING,

If the trench depth is excavated beyond the limits of the required excavation without the Contract Administrator's authorization, granular material shall be placed and compacted in the trench to reinstate the required trench limits prior to backfilling the trench as specified in the Contract Documents.

Get Price

Excavating, Backfilling Compacting Midvale, UT

All excavation, backfilling and compaction Work shall be in accordance with applicable regulations and as specified herein. B. Excavating, backfilling and compaction includes, but is not limited to the following 1. Preparation. 2. Excavation, backfilling and compaction. 3. Dewatering and/or runoff control measures. 4. Trench shoring. 5.

Get Price

17070/Trenching Backfilling for Piping Systems

TRENCHING AND BACKFILLING FOR PIPING SYSTEMS PART 1 GENERAL 1.01 WORK INCLUDED A. The work included under this Section consists of excavating, backfilling and compaction as requi red for th e c ons tructi on of the pi ping sys tems as spec ifie d herei n. (S ee Se cti on 023 14 for excavation for structures.) B.

Get Price

SECTION 02221 TRENCHING, BACKFILLING AND

10/08 02221-1 Trenching, Backfilling, Compaction SECTION 02221 TRENCHING, BACKFILLING AND COMPACTION PART 1 GENERAL 1.01 WORK INCLUDED A. Excavation for piped utility material. B. Provide necessary sheeting, shoring and bracing. C. Prepare trench bottom with appropriate materials. D. Dewater excavation as required.

Get Price

Requirements for Trenching and Backfilling by Customer for

trench depth. C. Backfill trench in layers, thoroughly tamping each layer to eliminate air pockets. D. Do not run wheels or tracks of equipment along trench to compact the backfill. E. Scenario B When the connection is being made at a later time, do not backfill the last 15 feet of

Get Price

City of Surprise Trench Specifications and Acceptance

3. In new residential construction, concrete placement shall not begin until all sewer, water and dry utility trench backfill has passing compaction testing results and provided to the Civil inspector. These may be copies of the testing technician field reports on company letterhead. 1.

Get Price

The Manitoba Water Services Board SECTION 022180

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING 201 September 3 AND BACKFILL Page 3 of 11 Hydrants under pressure, valve boxes, curb stop boxes and other existing utility controls shall be unobstructed and accessible during the construction period. .3 DISRUPTIONS OF SERVICES

Get Price

312333 trenching and backfilling WordPress

F. Construction of trench backfill. G. Construction of embankments. H. Excavation and backfill of test pits. I. Protection of utilities and maintenance in service of all utilities; including those to be removed; until said removal commences after replacement facilities have been constructed and placed in service. J. Compaction.

Get Price

DESIGN AND CONSTRUCTION STANDARDS Section 3

Page 2 of 2 02249-Trenching,Backfill and Compaction Revised 11/30/06 DESIGN AND CONSTRUCTION STANDARDS Section 3 Standards by CSI Divisions Trench Foundation The trench foundation shall be ALDOT 801 No. 57 crushed limestone or

Get Price

TRENCH EXCAVATION, BACKFILL SURFACE RESTORATION

This work shall consist of excavation, trenching, backfilling, and restoration of existing surfaces for the construction of underground utilities. The use of the term Plans, Specifications and Special Provisions within this specification shall be

Get Price

TRENCHING, BACKFILLING AND COMPACTION

Trenching, Backfilling and Compaction.doc 02221 1 TRENCHING, BACKFILLING AND COMPACTION PART 1 GENERAL 1.01 SUMMARY A. Work to be performed under this section shall include all labor, equipment, materials and miscellaneous items necessary to perform all excavation, backfilling and compaction of

Get Price

2.1 MEASUREMENT AND PAYMENT

Measurement and Payment Page 2.1-2 City of Fairfax, VA Public Facilities Manual February 2017. Measurement and Payment In accordance with Section 2.3 Trenching, Backfilling, and Compaction of Utilities, all excavation and backfill shall be included in

Get Price

Services Welcome To California Compaction Corp.

Trenching and Boring Multi-Phase Multi Stage Underground Power and Communication Systems Trenching Specialized Backfill operations requiring Compaction throughout intermediate levels. Hard Rock Trenching any Depth or Width. Production Trenching of all kinds Direction Drilling and Horizontal Boring any Size, Type or Depth.

Get Price

SOUTHERN CALIFORNIA GAS COMPANY SPECIFICATIONS

pay all inspection fees, and satisfy any and all other requirements pertaining to trenching, backfilling and compaction called for by authorized governing agencies. It is agreed that all trenches shall contain only dry utilities, be of such size as to provide a minimum vertical

Get Price

DIVISION 31 EARTHWORK 31 23 00 EXCAVATION AND FILL

DIVISION 31 EARTHWORK 31 23 00 EXCAVATION AND FILL 31 23 33 TRENCHING AND BACKFILLING MARCH 30, 2017 TRENCHING AND BACKFILLING backfill. Where compaction around utilities or tight structures is necessary, CDF may be a

Get Price

TABLE OF CONTENTS townofclaytonnc

1.1 trenching, backfilling and compaction of utilities 00950-1 1.2 water 00950-6 1.3 sewer 00950-13 1.4 storm drainage 00950-19 1.5 earthwork 00950-21 1.6 base course paving 00950-23 1.7 curb gutter, driveways, sidewalks, and miscellaneous concrete items 00950-29

Get Price

DIVISION 31 EARTHWORK 31 23 00 EXCAVATION AND

DIVISION 31 EARTHWORK 31 23 00 EXCAVATION AND FILL 31 23 33 TRENCHING AND BACKFILLING . SEPTEMBER 16, 2016 TRENCHING AND BACKFILLING backfill. Where compaction around utilities or tight structures is necessary, CDF may be a cost effective alternate to mechanically compacted fills.

Get Price

Northshore Utility District King County, Washington 2019

Engineering Specifications Methods of Construction February 2019 MET 2 The refuse resulting from the clearing operation shall be hauled to an approved waste site secured by the Contractor and shall be disposed of in such a manner

Get Price

Dry Utilities Tiger Trenching

As an industry leader in trenching services, Tiger Trenching is well-equipped to handle an entire process from digging the trench through to the backfill service at the end of the project. Because we work primarily in the Tri-State area, we are able to maintain close working relationships with the local public and private utility companies.

Get Price

INSTALLATION OF PIPE AND TESTING OF PIPE BACKFILL

INSTALLATION OF PIPE AND TESTING OF PIPE BACKFILL Prior to excavating the trench area, all utilities should be located by a qualified contractor. Excavate Trench Proper trench widths will allow for proper compaction alongside the pipe. Trench widths may be varied, based on the competency of the in‐situ soil, backfill materials, compaction

Get Price

Gulf Shores Utilities Baldwin County, Alabama

PART 1 GENERAL 1.01 WORK INCLUDED A. The work included under this Section consists of clearing, excavating, grading and backfilling as required for the construction of the utility systems consisting of piping and appurtenances as shown on the Drawings and specified herein. PART 2 PRODUCTS 2.01 BEDDING MATERIAL A. Bedding material for

Get Price

Trench Backfill Is it best to compact, jet, fill, or dump

Oct 11, 2009Trench Backfill Is it best to compact, jet, fill, or dump? In construction, there are many methods to accomplish the same result. The main requirement is that the work is done according to the specification written for that particular project.

Get Price

SECTION 02321 EXCAVATION, BEDDING, AND BACKFILL

B. CONTRACTOR may, if it chooses, use a motor powered trenching machine. If they do, however, they shall be fully responsible for the preservation or repair of existing utility service connections and the adequate compaction of backfill material. C. Unless the construction of lines by tunneling, jacking, or boring is called for by the

Get Price

S3800 Trenching and Backfill Woodburn

F. TRENCH BACKFILL Trench b ackfill is defined as the furnishing, placing and compaction of material in the trench between the top of the pipe zone material and the bottom of the pavement base rock, ground surface, or surface material as directed.

Get Price

Home of Precision Excavation and Demolition Excavating

Home of Precision Excavation and Demolition Excavating, Trenching and Concrete Demolition in Ramona,, and surrounding areas. Call me today at 760-803-4446 to learn more.

Get Price

SPECIFICATIONS DETAILED PROVISIONS Section 02221

A. Trench, backfill, and compact as specified herein and as needed for installation of underground utilities associated with the work. B. Verification of Existing Conditions. It shall be the responsibility of the Contractor to examine the site of the work and to make all investigation necessary, both surface and

Get Price

Electric Trench Backfill Silicon Valley Power

Quail Hollow "Utility Trench Sand" Decker Island "DI Fill Sand" When sand is used as a trench backfill component, it is to be installed in such a manner so as not to displace, damage, or collapse the trench substructures. A minimum compaction of 90% is required in landscaped areas. A minimum compaction of 95% is

Get Price

TRENCH BACKFILL Roseville

Backfill for joint utility trench shall be sand compacted 85% relative compaction (TYP), above the 4 utilities occupying the joint trench. Then backfill with native material free of all deleterious materials, rocks or boulders compacted to 90% within one (1) foot of final grade and 95% the last foot.

Get Price

1 SECTION 1505 EXCAVATION, TRENCHING, PIPE LAYING

Section 1505 SECTION 1505 15-3 1 2 EXCAVATION, TRENCHING, PIPE LAYING 3 AND BACKFILLING FOR UTILITIES 4 1505-1 DESCRIPTION 5 Perform all excavation, undercut, foundation conditioning, pipe laying, bedding, backfill and 6 pavement, sidewalk and driveway repair necessary for installation of utilities.

Get Price

City of Lincoln Backfill Compaction in Right of Way Areas

Backfill Compaction in Right of Way Areas . Soil compaction is defined as the method of mechanically increasing the density of soil. If performed improperly, settlement of trench backfill and utility excavations can occur and result in unnecessary maintenance costs and/or failures in pavements, sidewalks, and structures. C. ity of Lincoln